Somehow Day 100 came and went without a ceremonial post or celebration. Looking back at my original schedule, I'd planned on being much farther along at this point. But such is construction.
This past week our septic guy has been out putting in our system. It consists of a buried tank and several buried lateral lines. He's installed the lateral lines and has dug the trench part of the way from our house out to the tank. I never thought I'd be this excited about a septic system!
Daily Stats | Hours Worked |
Cost
| |||
Day | Trevor | Family/Friends | Contractors | ||
Today | 102 | 0 | 0 | 8 | |
All Time | 102 | 98 | 93 | 394.5 | $13,496.75 |
Summary of 7/17/2014
| Work Done Today | ||||
Materials Used Today | |||||
Who Helped Today | |||||
Contractors On Site | |||||
Gary Ivy
| |||||