Today we had another great day of fall weather. We were able to make progress on two fronts.
Foremost on our agenda is the roof. It's part of getting the house weather-tight as soon as possible. Today were got half of the long 20 foot pieces on the front of the roof installed. It was a windy day and it took four of us to get it done. Mandy and Kim were on the ground and handed the pieces up to Steve and I on the roof. Steve stood on the 4-12 roof and passed them up to me while I stood on the ladder on the 12-12 roof.
We also had Vanderford Construction on site today. They poured the driveway and our short sidewalk. The kids were disappointed that they didn't get to carve their initials in the wet cement. That ship sailed when they weren't out there for the back porch pour.
Daily Stats | Hours Worked |
Cost
| |||
Day | Trevor | Family/Friends | Contractors | ||
Today | 211 | 10 | 12 | 24 | |
All Time | 211 | 281 | 352 | 1393.5 | $13,496.75 |
Summary of 11/3/2014
| Work Done Today | ||||
Poured driveway pad, front roof
| |||||
Materials Used Today | |||||
concrete, roof
| |||||
Who Helped Today | |||||
Steve, Kim, Mandy
| |||||
Contractors On Site | |||||
Vanderford
| |||||